Space size & layout
- Square footage and number of floors or suites
- Open plan versus private offices, high-density workstations and built-in fixtures
- Counts of workstations, desks, chairs, file storage and breakroom appliances
COST GUIDE
Decommissioning cost follows the space, the building and the plan for what happens to every item. This guide explains the factors that move a quote, the risks that inflate it, and what to send a contractor so you get a firm, itemized price.
Two offices of the same size can cost very different amounts to clear. Workstation counts, equipment, building rules and disposition plans differ, so a per-square-foot figure usually misleads. We do not publish fixed pricing. After a walkthrough, you receive a firm written project quote, not an hourly estimate, covering labor, haul-out, disposition and schedule.
That quote comes from a defined scope: a count of what is in the space, how it has to come out, and where it goes. The sections below show what shapes that scope, as part of a full office decommissioning project.
What we look at during a walkthrough, and why each one moves the quote.
A short pre-decommissioning audit makes every quote more accurate. Facilities and workplace teams can walk the space with this list before contractors arrive:
For a fuller sequence from lease end to handover, see the Office Exit Checklist.
Most overruns come from information that surfaced late, not from the work itself.
We are not lawyers and do not give legal advice. Lease questions, such as holdover terms, belong with your counsel or broker. See lease exit & landlord handover for how we work from the clause.
Send as much of this as you have. We confirm the rest at the walkthrough.
A written scope and a firm project quote, a schedule set to your handover date, and closeout documentation for the work we complete, including disposition records and photos. If something comes up after the quote, we handle the change in writing before work proceeds.
Joel Nielsen is a process engineer. A counted scope, a sequenced plan and a documented closeout are what make a quote repeatable and the project predictable.
San Jose, Silicon Valley, Santa Clara County and the broader San Francisco Bay Area.
There is no single number, because the price follows your space: its size and layout, the volume of furniture and equipment, how the building lets crews work, and where each item goes. We do not publish fixed prices. After a walkthrough we send a firm written project quote covering labor, haul-out, disposition and schedule.
Two offices of the same size can differ widely in workstation count, equipment, access and disposition. Square footage is a starting point; a walkthrough captures what is actually in the space and how it has to come out, so the quote reflects the real scope.
Fixed. You receive a firm written project quote rather than an hourly estimate. The scope behind it is built from what we count and confirm at the walkthrough.
Changes to the agreed scope: added items, a different handover date, new building restrictions or access conditions that were not disclosed at the walkthrough. We handle any change in writing before work proceeds, so nothing is added silently.
Sometimes, but we do not promise it. Reuse, resale, donation, recycling or disposal is set per item in the agreed scope, and what a given item can realistically do depends on its condition and the market. We tell you what we expect at the walkthrough and put the plan in writing.
Those sit outside our scope. We flag them at the walkthrough and tell you whether each needs your landlord or a specialist, so their cost and timing are in your budget early. Cabling and server rooms are scoped separately; see our ITAD and cabling coordination.
The lease-end or handover date, the address and floor, a rough headcount or workstation count, the surrender or restoration clause if you have it, the building’s move-out rules, and any server room, secure area or special equipment. We confirm the rest at the walkthrough.
Want a firm number for your space? Start with a walkthrough.